We have data services jobs that are triggered by event based BW cyclic process chains. Being event based they do not run at specific times. The target of these jobs is a HANA database that has some scheduled outages.
Is there a way to build logic into the data services job or process chain to not trigger if the target system is down?
Thanks,
Ken